DC fastExploren24-hour access

Greenway Wetherill Park - Central Carpark

1183-1187 The Horsley Dr, Wetherill Park NSW 2164, Australia

150 kW charging across 1 charging stalls, operated by Exploren. A$0.72 per kWh listed.

EV charging at Greenway Wetherill Park - Central Carpark
150 kW1 charging stalls
Exploren

Charging location

Wetherill Park, New South Wales

CCS2

The record

The station at a glance

Greenway Wetherill Park - Central Carpark is listed as dc fast charging in Wetherill Park, New South Wales, operated by Exploren. It records 1 charging stalls and CCS2 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
150 kW
Stalls
1
Connectors
1
Listed price
A$0.72

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingShopping Center

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Cabramatta HotelAC

Cabramatta Hotel

4 kW2 stalls

Cabramatta, New South Wales· 6.3 km

Type 2
Price not listedTesla Destination
EV charger at Max Webber LibraryAC

Max Webber Library

7 kW2 stalls

Blacktown, New South Wales· 8.8 km

Type 2
A$0.25 /kWhExploren

Ampol Foodary Eastern Creek Eastbound is 5.5 km away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS2. An adapter may bridge another standard, but support varies by vehicle and station.

Common questions

Charging at Greenway Wetherill Park - Central Carpark

Where is Greenway Wetherill Park - Central Carpark?

Greenway Wetherill Park - Central Carpark is at 1183-1187 The Horsley Dr, Wetherill Park NSW 2164, Australia.

How fast can I charge at Greenway Wetherill Park - Central Carpark?

Greenway Wetherill Park - Central Carpark lists a peak of 150 kW (DC fast) and CCS2 connectors.

How much does charging cost at Greenway Wetherill Park - Central Carpark?

Greenway Wetherill Park - Central Carpark quotes A$0.72 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Greenway Wetherill Park - Central Carpark have?

Greenway Wetherill Park - Central Carpark lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.